"Houston we have base rock" 9-27-2011
Forestry has brought in almost all the base rock for the perimeter trail. Tomorrow the rock with be graded in preparation for the surface rock. There is still quite a bit of rock and soil work to do at the far south end of the trail( where it meets the M-K-T). So for the meantime there will be a period where no connectivity between the two remains.
Today the last concrete pour was made at the pump house building, to fill in the window, door and floor openings. Now the count starts for 28 days before back filling operations can commence. Back filling will be the first stage in the preparation for the green of the structure.