Tuesday, September 27, 2011

"Houston we have base rock" 9-27-2011



Forestry has brought in almost all the base rock for the perimeter trail. Tomorrow the rock with be graded in preparation for the surface rock. There is still quite a bit of rock and soil work to do at the far south end of the trail( where it meets the M-K-T). So for the meantime there will be a period where no connectivity between the two remains.

Today the last concrete pour was made at the pump house building, to fill in the window, door and floor openings. Now the count starts for 28 days before back filling operations can commence. Back filling will be the first stage in the preparation for the green of the structure.

Friday, September 23, 2011

Urban Ecology Restoration Project 9-23-2011

Non-woven geo-fabric has been installed in preparation for trail base rock material. The installation of geo-fabric reduces the amount of base rock required to build a trail, thereby reducing the time and cost of trail installation and maintenance. This is a pilot project for a greener way of trail construction.

Forestry's four man permanent crew will continue their efforts to get this trail built and open for users as fast as they possibly can while contending with the many other responsibilities and projects they have to work on concurrently.