Thursday, January 12, 2012

3M Urban Ecology Restoration Grant structure backfill

This week, until today, saw the grading contractor back on site. The remainder of the 'riverbed' channel and splash pool are in the first stages of being formed. The abandoned pump house structure is being back-filled with the excavated materials from the riverbed. This will make a manageable slope running from the riverbed up to what will be the green-roofed structure.

The non load-bearing masonry walls (seen here in tan) will be removed and the structure will have four open sides. It will house some of the interpretive sign system that is in the process of being designed. From the structure you will be able to view the M-K-T trail and look across the wetlands cells, due south. This will be an exciting addition to an already valuable project.

Saturday, January 7, 2012

The Maplewood Barn building is under roof


The good weather over the last week has really let Sircal Construction get a lot of progress on the Maplewood Barn.


The exterior walls and roof have been erected. The building will be wrapped in Tyvek (a water protection material that also helps stop drafts) next week. The siding may get started as well. The metal roofing will then get going.

Here's hoping the "winter" weather continues.

Thursday, December 22, 2011

First Level Walls of the Maplewood Barn are up


Sircal Construction just completed the first level walls. Next they'll install the beams and columns for the second level and roof. Considering they started last week and lost a couple days to weather it's going up pretty quickly.

GoColumbiaMO Stormwater Utility: Green Roof AND Green WALLS

GoColumbiaMO Stormwater Utility: Green Roof AND Green WALLS

Wednesday, December 21, 2011

Green roof trip


Dr. Hwei-Yiing Johnson, State Agronomist with Cooperative Extension at Lincoln University hosted a tour of the Allen T. Busby Farm that showcases some of her research on green roof/facade and food mulching/composting. A mix of City, County and University professionals visited the site to learn more about these activities.



Dr.Johnson's excitement and enthusiasm were not dampened by the cold north wind!

Installed green roof and multiple applications of green facades.

Friday, December 16, 2011

Maplewood Barn walls are going up





























Sircal Construction started installing the wall panels for the new barn yesterday. These panels are constructed of OSB with foam in between. They have great insulation and, once connected together, form a very sturdy wall and roof system. Plus they go up very quickly. The "barn" should be be looking like a barn pretty soon. Then the interior work should begin.

Tuesday, December 13, 2011

Scotts Branch Trail

The 8' wide concrete trail from Rollins to Weaver has been completed. We will begin back filling the trail with soil, placing straw mulch and spreading winter wheat for erosion control as soon as the weather allows.