The 8' wide concrete trail from Rollins to Weaver has been completed. We will begin back filling the trail with soil, placing straw mulch and spreading winter wheat for erosion control as soon as the weather allows.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment