Due to site conditions and predicted weather forecast, work will not be able to be performed on bridge #12 for the remainder of this week. The temporary crossing at Bridge #13 is open, but please use extreme caution on this section as flooding has removed some of the surface rock.
Bridge #12's crossing is severely damaged and use of it is not recommended. We will be keeping a close eye on the creek level over the next several days and will be back on site as soon as is reasonably possible.