Once the walks are complete, the conduit is finished and the poles installed, the sodding of the area immediately in front of the stage and seeding/strawing of the other areas can happen.
Inside there's HVAC work going on. The Maplewood Community Theater has contracted with a plumber to do the fixture and finish plumbing work. And the group has started to load their theater materials in.
Dedication is in 16 days. But with a little luck and some dry weather it should be looking pretty good.
There are more photos of the construction at minus.com.