If the weather holds and other projects cooperate, the work to repair the entry road at Twin Lakes Recreation Area (TLRA) will begin in a couple weeks.
This work will require the road to be CLOSED TO ALL PUBLIC TRAFFIC during the hours of 7 am to 3 pm Monday-Friday. The road will be re-opened each evening and on the weekends.
If you need to access the park during the day Monday-Friday, please use the MKT Trail or the new County House Trail. Both will remain open during the road closures.
The dog park will be open. However access during the day will only be via the MKT or County House Trails. The two other fenced dog parks available at Garth Nature Area and at Indian Hills Park. Off leash areas are available at Grindstone Nature Area and in Cosmo Park- Bear Creek Nature Area. Please see our off-leash info webpage.
This closure is for the safety of the public. There will be impassable areas, trenching for pipes and many rock trucks. All of these present safety hazards to people and property.
The closure is also necessary so the construction work can proceed quickly. Every time construction is stopped for a passing car, bike or pedestrian adds to the length of the road closure.
If you have questions/comments please call 874-7201 or e-mail Toney Lowery at ajlowery@gocolumbiamo.com
Showing posts with label Twins Lakes Recreation Area.. Show all posts
Showing posts with label Twins Lakes Recreation Area.. Show all posts
Monday, October 3, 2011
Tuesday, August 16, 2011
Twin Lakes Recreation Area entry road
The entry road for Twin Lakes Recreation Area will be undergoing some much needed re-construction soon.
The road has been deteriorating for several years now and is in need of a major rebuild. The high water table, poor drainage, several years of above average rain, several years of very cold winters and the construction of the County House trail have all taken their toll.
However repairs and reconstruction will begin shortly.
The first work will be the undergrounding of the electric lines coming into the park. This work has already begun and will continue for the next several weeks. There will be short interuptions in electric service to the park during this time.
Funding for the road re-build should be available October 1st. At that time the real road work will begin. Be on the look out for heavy equipment, lane and/or road closures, rock and other construction materials.
Subscribe to:
Posts (Atom)