The wet weather slowed the work at the Paquin but it's picking up. The Horticulture crew is doing some shape up and the fencing contractor should be on site next week.
The wooden raised garden beds are being replaced. That work should be complete within a couple weeks. The beds will then be available for planting. Fencing around the garden area and re-grading of the excess soil are the next two steps.