As reported on KOMU.com the bridge sections for a historical display are being stored on site in preparation for our construction crews to be able to start work on the historical marker. Construction is scheduled for later this summer.
The replacement for the #12 Bridge on the MKT Trail has been set.
Hopefully the weather will hold and the rest of the work can continue.
Note that the Trail is not open yet. The approaches to the bridge still need to constructed. And there are sections of railing that still need to be installed.
But with good weather the trail could be open in two-three weeks.
P&R Staff along with a contract equipment operator (Richardson Construction) will be installing three large culverts in order to help reduce washouts along the trail. The trail will remain open, but it may require users to stop and slowly proceed around the trenches. Please be careful as often the equipment operators will not be able to hear you.
Work will be done between MKT Stadium and Forum Blvd.