Thursday, May 10, 2012

Atkins overflow parking area ready for use

With the third field almost ready for use it was apparent there was need for additional parking at the Atkins Ballfield Complex. There's a new graveled area that can be used for parking if the asphalt lots fill up.

By a lucky coincidence, this gravel area in is the spot were there was a top soil stockpile. Since the topsoil needed to be moved it was placed where the two remaining fields will be eventually built. They'll be getting a temporary seeding to prevent erosion but the fields will be seeded with the outfield grass in the fall.Until their final construction these areas could become warm up fields.

No comments: